AutoCAD Standards

All drawings shall be delivered 100% AutoCAD DWG format and 100% editable, but at the consultant's discretion, may be submitted in an un-editable media like CD-ROM. Both Digital and Hard Copy documents shall match. Record drawing items must match their true location.

Survey

Topographic surveys shall be delivered in NAD 83 Idaho State Plane west zone coordinates modified to the Ada County Local GIS Coordinates (Horizontal), NAVD 88 (vertical). Both Horizontal and Vertical information must be accounted for.

File Names

Project Name_WAT_SEW_PRELIM.dwg for Preliminary or Pre Plat
Project Name_WAT_SEW_CONST.dwg for Final Plat or Approved Construction
Project Name_WAT_SEW_REC.dwg for Record Drawings

Layer Details: Names, Colors, and Descriptions
Layer Name Color Description
BOUNDARY_SUB GREY Subdivision boundary line
FLOODPLAIN BLUE Floodplain outline
FLOODWAY CYAN Floodway outline
IRR_GRAVITY BROWN Gravity irrigation line
IRR_GRAVITY_MANHOLE BROWN Gravity irrigation manhole 
IRR_GRAVITY_SERVICE  BROWN Gravity irrigation services 
IRR_GRAVITY_VALVES  BROWN Gravity irrigation valves
IRR_ORAVITY_PUMPS BROWN Gravity irrigation pumps
IRR_GRAVITY_BOX  BROWN Gravity irrigation box
IRR_PRESSURE  MAGENTA Pressure irrigation line 
IRR_PRESSURE _MANHOLE  MAGENTA Pressure irrigation manhole 
IRR_PRESSURE _SERVICE  MAGENTA Pressure irrigation services
IRR_PRESSURE _VALYES MAGENTA Pressure irrigation valves 
IRR_PRESSURE _PUMPS  MAGENTA Pressure irrigation bumps
IRR_ PRESSURE_BOX MAGENTA Pressure irrigation box
RECORD_LOTS  GREY Lot lines of parcel
SEWER_AIRVAC GREEN Air Vacuum System
SEWER_(pipe size) GREEN Sewer line (separate layer for each size) 
SEWER_ CASING SEWER_ GREEN Sewer casing
CLEANOUT GREEN Sewer cleanouts
SEWER_LIFT_STATION GREY Lift Station 
SEWER_MANHOLE  GREEN Sewer manhole
SEWER_PRESS_(pipe size)  GREEN Pressure sewer line (separate layer for each size)
SEWER_SERVICES  GREEN Sewer service line
ST_LIGHT  WHITE Streetlight
STORM_DRAIN  CYAN Storm drain line Storm
STORM_MANHOLE CYAN drain manhole Storm
STORM_CATCHBASIN  CYAN drain catch basin Storm
STORM_SAND_TRAP  CYAN drain sand trap Storm
STORM_GREASE_TRAP  CYAN drain grease trap Storm
STORM_SEEPAGE_BEDS  CYAN drain seepage beds Storm
STORM_PONDS  CYAN drain ponds
TEXT_LOTS  WHITE Lot and block number 
TEXT_STREETNAMES  WHITE Street name 
TEXT_SUBDIVISIONS  CYAN Subdivision name
WATER_AIRVAC  BLUE Air Vacuum System
WATER_(pipe size)  BLUE Water line (separate layer for each size) 
WATER_BLOWOFF  BLUE Water blow off
WATER_BOOSTER  BLUE Booster 
WATER_CASING  BLUE Water casing 
WATER_FIRE_LINE CYAN Fire line
WATER_HYDRANT CYAN Fire hydrant
WATER_HYDRANT_LINES CYAN Fire hydrant lines
WATER_METER BLUE Water meter
WATER_PIV  MAGENTA Pressure irrigation valve
WATER_PRV  BLUE Pressure reducing valve 
WATER_SERVICES  BLUE Water service line
WATER_VALVES  BLUE Water valve
WATER_WELLS GREY Well house

Item Formatting

Use thinner line weights and lighter colors for existing items. Lines must connect, and if part of a polygon, snapped closed. Use blocks provided in the template drawing for points. Please refer to sample drawing. In AutoCAD terminology, a closed line is a polygon.

Appendix A: Company Templates

Company templates were added to the Public Works AutoCAD standard to allow companies that already have a design standard in place to continue to use that standard, provided that the necessary information is present and can be extracted. If your company does not have a standard in place, the Public Works Department has created a template that follows this guideline to help your company comply with the standards more easily. We encourage you to take advantage of these resources.
The Meridian Public Works Department will make every attempt to use your company’s existing standard. However, there are several requirements that must be met and may require a change in your company’s template. These are outlined below:

  • File Names must define project and status in planning process
  • Items of different types/size must be discernable from each other
    • Sewer lines broken out by size
  • Survey Projection must conform to location of project 
    • Correct UTM Zone for Ada County
  • Lines must be snapped and closed and solid 
    • No text breaking up the line
    • This is for water and sewer modeling purposes

Company standard must be compatible with the Public Works GIS Processing. The above guidelines will help your standard complete the standards approval process more easily. Remember your company standard must be pre-approved before drawings will be accepted. If your company has not completed the pre-approval process all drawings must comply with the Meridian Public Works AutoCAD standards in order for drawings to be accepted.